image
image
image


Axiom Management & Engineering, Inc.

Trinity Railway Express
Euless South Main Bridge Replacement

During this project Axiom M&E  Provided the following services:

  • Construction Management

  • Railroad Engineering

  • Contract Administration

  • On-Site Observation

  • Storm Water Management

Click to Enlarge

 

This project consisted of the replacement of dual twin timber railroad bridges that was burned by arson. This bridge remained in service while the adjacent bridge was replaced.
 

The bridges carried over 40 trains (passenger and freight) a day. The new bridges were 196 feet long and consisted of steel pile and precast caps and beams.

Click to Enlarge
 

It was determined that one of the bridges was structurally sufficient to carry the train loading. Upon completion the other bridge was removed from service and replaced.

Click to Enlarge

Contact us for more info


image
image